Power Plant Mechanical Contracting & Outage Solutions

Mechanical equipment erection, high-pressure process and utility piping networks, coal handling plant (CHP) structures, electrostatic precipitator (ESP) ducting and planned outage overhauls for thermal and captive power installations.

Heavy Lift Handled110 MT
Certified Welders30 Crew
Welding Qualification6G / GTAW / SMAW
Turnaround Crew24/7 Shifts
POWER PLANT DOMAINS

Core Execution Capabilities

[01] COAL HANDLING PLANT (CHP)

Conveyors, Bunkers & Crushers

Fabrication and site erection of elevated coal conveyor gallery trusses, bent trestles, transfer towers, raw coal bunkers, ring granulator / crusher structural supports and tripper conveyor lines.

Gallery SpansUp to 36 Meters
BunkersHeavy MS Plate Fabrication
[02] DUCTING & FLUE GAS SYSTEMS

ESP, ID Fans & Process Ducts

Fabrication and erection of heavy rectangular and circular flue gas ducting runs, electrostatic precipitator (ESP) casing supports, expansion bellows fit-up, ID/FD fan casing overhauls and rotor dynamic alignment.

Ducting ScopeFlue Gas, Hot Air, Gas Ducts
Joint TestingKerosene / Vacuum Leak Tests
[03] UTILITY & STEAM PIPING

Process Pipelines & Auxiliary Alignment

Erection and testing of high-pressure cooling water headers, compressed air networks, ash slurry disposal lines, auxiliary feedwater pumps, boiler feed pump gearboxes and motorized valve stations.

Welding CodesASME Sec IX / IBR Standards
Pressure TestingHydrostatic Test Sign-off
OUTAGE RESPONSE

Continuous 24/7 Outage Mobilization

Delivering high-intensity mechanical work under tight power plant outage schedules.

CRITICAL PATH

Round-the-Clock Shifts

Continuous 2-shift operations with certified safety supervisors on both shifts. Critical-path dismantling starts within 60 minutes of formal Lockout-Tagout (LOTO) clearance.

QUALIFIED RIGGING

Tandem Crane Lifts

Heavy lifting tackle, spreader beams and calibrated rigging equipment tested and certified under Indian Factories Act standards for high-elevation equipment positioning.

STATUTORY CLEARANCE

Zero Onboarding Friction

Complete statutory package: GSTIN 20BTFPK4771H1ZU, MSME Udyam UDYAM-JH-01-0004061, monthly EPF electronic returns, ESIC and Workmen Compensation coverage.

Planning a thermal or captive power plant outage?

Contact Shri Pramod Kumar Sharma for shutdown team reservation, scope assessment and written commercial quotation.