Bulk storage silos up to 2,000 MT with hydraulic jacking
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Supplying turnkey shutdown gangs, VRM roller liner maintenance, and 2,000 MT silo construction capabilities to integrated cement manufacturing complexes throughout the Maihar-Sarlanagar corridor.
Engineering specifications deployed directly to plant locations across the Maihar-Sarlanagar Cement Corridor.
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Active industrial manufacturing corridors within our rapid field dispatch radius.
Providing high-tonnage structural fabrication, machinery alignment, crane rigging, and planned shutdown support with deployable technical gangs.
Providing high-tonnage structural fabrication, machinery alignment, crane rigging, and planned shutdown support with deployable technical gangs.
Providing high-tonnage structural fabrication, machinery alignment, crane rigging, and planned shutdown support with deployable technical gangs.
Providing high-tonnage structural fabrication, machinery alignment, crane rigging, and planned shutdown support with deployable technical gangs.
Representative project packages delivered across Dalmia Bharat, Jaypee Group, and associated regional plants.
| Job ID | Client Enterprise | Site Location | Executed Engineering Scope | Capacity / Metric |
|---|---|---|---|---|
| JOB #1 | Jaypee Bokaro Cement (Jaiprakash Associates Ltd.) | Bokaro, JH | Fabrication and erection of fabricated parts | Heavy Mechanical |
| JOB #3 | Dalmia Cement | Bokaro, JH | Packer-3: fabrication, equipment erection, commissioning | 240 TPH |
| JOB #4 | Dalmia Cement | Bokaro, JH | Cement steel silo: fabrication, erection, commissioning | 1,000 MT |
| JOB #5 | Dalmia Cement | Bokaro, JH | Truck tippler: fabrication, erection, commissioning | 7 tipplings/hr |
| JOB #6 | Dalmia Cement | Bokaro, JH | Bag house: fabrication, erection, commissioning | 200,000 m³/hr |
| JOB #7 | Dalmia Cement | Bokaro, JH | Hot air duct replacement: erection of fabricated parts, commissioning | Heavy Mechanical |
Contact Shri Pramod Kumar Sharma for mobilization timelines, crane availability, and site audit across Maihar-Sarlanagar Cement Corridor.
Direct: +91 8873100219 | Operating from Bokaro, Rajgangpur and Rewa