Bulk storage silos up to 2,000 MT with hydraulic jacking
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Deploying high-tonnage equipment erection crews and 6G certified welders directly into the Rourkela Steel Plant (SAIL) operational sphere and surrounding heavy engineering fabrication yards.
Engineering specifications deployed directly to plant locations across the Sundargarh Industrial Belt & Steel Corridor.
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Executed under strict quality protocols (IS 800 / AWS D1.1), non-destructive testing (NDT), and zero-compromise industrial plant safety rules.
Active industrial manufacturing corridors within our rapid field dispatch radius.
Providing high-tonnage structural fabrication, machinery alignment, crane rigging, and planned shutdown support with deployable technical gangs.
Providing high-tonnage structural fabrication, machinery alignment, crane rigging, and planned shutdown support with deployable technical gangs.
Providing high-tonnage structural fabrication, machinery alignment, crane rigging, and planned shutdown support with deployable technical gangs.
Providing high-tonnage structural fabrication, machinery alignment, crane rigging, and planned shutdown support with deployable technical gangs.
Representative project packages delivered across Dalmia Bharat, Jaypee Group, and associated regional plants.
| Job ID | Client Enterprise | Site Location | Executed Engineering Scope | Capacity / Metric |
|---|---|---|---|---|
| JOB #1 | Jaypee Bokaro Cement (Jaiprakash Associates Ltd.) | Bokaro, JH | Fabrication and erection of fabricated parts | Heavy Mechanical |
| JOB #3 | Dalmia Cement | Bokaro, JH | Packer-3: fabrication, equipment erection, commissioning | 240 TPH |
| JOB #4 | Dalmia Cement | Bokaro, JH | Cement steel silo: fabrication, erection, commissioning | 1,000 MT |
| JOB #5 | Dalmia Cement | Bokaro, JH | Truck tippler: fabrication, erection, commissioning | 7 tipplings/hr |
| JOB #6 | Dalmia Cement | Bokaro, JH | Bag house: fabrication, erection, commissioning | 200,000 m³/hr |
| JOB #7 | Dalmia Cement | Bokaro, JH | Hot air duct replacement: erection of fabricated parts, commissioning | Heavy Mechanical |
Contact Shri Pramod Kumar Sharma for mobilization timelines, crane availability, and site audit across Sundargarh Industrial Belt & Steel Corridor.
Direct: +91 8873100219 | Operating from Bokaro, Rajgangpur and Rewa